摘要
通过对南昆铁路西段隧道施工中掘进、支护、运输、衬砌、通风等技术的介绍,分析了施工技术应用中存在的问题,并提出了改进措施和建议。
This peper introduces the technique for excavation, support, transportation, lining and ventilation during construction of tunnels on Nankun Railway (west section), analyzes the problems occurred in the application of construction technique, and presents some suggestions and measures for improvement.
出处
《世界隧道》
2000年第1期28-31,35,共5页
关键词
铁路隧道
施工技术
掘进
支护
衬砌
Railway Tunnel
Construction Technique
Problems Countermeasures