摘要
在分析电源规划中专家经验的基础上 ,将产生式专家系统引入电源规划中 ,实现了对工程约束条件 (即工程专家经验 )的表示 ,并在规划前期实现了对不可行方案的大量裁减 ,从而减少了规划后期优化计算的工作量。同时 ,结合生产模拟方法 ,设计出了基于专家系统的电源规划方法 ,并进行了验证。结果表明
Based on the analysis of expert experience on generation system planning(GPS), the theory of knowledge based method is introduced into GPS to express the constraints of engineering(viz. Expert experience of engineering), and to discard abundant improper program during the earlier stage of GPS. In this situation, the difficulty degree of optimizing calculation in the later stage of GPS is lessened. And then, integrating expert system with production simulation in a method of GPS is proposed and is verified with an example. The results show that the method presented is effective.
出处
《重庆大学学报(自然科学版)》
CAS
CSCD
2000年第4期106-109,共4页
Journal of Chongqing University
基金
国家自然科学基金资助项目 !(7950 0 0 2 2 )
关键词
专家系统
电源规划
约束条件
生产模拟
expert system
power system planning
constraint conditions
production simulation