期刊文献+

广西大新锰矿280m平硐掘进机械化作业线的配套方式 被引量:3

Supporting Way of Machinery Line Cave in Drifting of 280 m in Daxin Mn-mine
在线阅读 下载PDF
导出
摘要 简述国内平巷掘进机械化作业线的配套方式和适用条件,介绍了广西大新锰矿280m平硐掘进机械化作业线的配套方式。采用YT-28气腿式凿岩机、LD-120型挖斗式装岩机、8m3的S8型梭式矿车和10 t架线式电机车机械化作业线配套方式取得较好效果。 This paper tells of supporting way in having sketched the machinery operating line of domestic heading reaches in the main body of a book applying to condition.Machinery Line Cave in Drifting of 280 m in Daxin Mn-mine of driving supporting way is a choice.We have adopted YT-28 in making dyadic rock drill of leg,the LD-120 type in exploiting dyadic of the S8 type shuttle car in packing rock aeroplane with 8 m3 machinized in operating line of dyadic electromobile of 10 t stringing supporting way,as has got comparatively good effect at present.
作者 朱其昌
出处 《中国锰业》 2012年第4期11-12,共2页 China Manganese Industry
关键词 280m平硐 掘进 机械化作业线 效果评价 280 m of footrill Tunnelling Machinized operating line Effect
  • 相关文献

参考文献2

  • 1董方庭,姚玉煌,黄初,等.井巷设计与施工[M].北京:中国矿业大学出版社,2004.
  • 2高金凤,王天凤,刘启明,等.大新锰矿60万t/a地下开采工程280m排水平硐施工说明书[R].长沙:中冶长天国际工程有限责任公司,2006,12.

同被引文献15

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部