摘要
对深异形地下连续墙施工的关键点进行了系统的研究、探讨,归纳出了深异形地连墙施工的7个关键环节。分别对这7个重点问题进行了论述,并通过工程实例,对其应用效果加以验证。
The paper studied and discussed the difficult and important points of hadal depth & abnormal shape underground diaphragm wall and inducted 7 key links of construction for hadal depth & abnormal shape underground diaphragm wall. Discussion was made on these 7 issues by engineering case to verify the application effects.
出处
《探矿工程(岩土钻掘工程)》
2012年第11期44-50,共7页
Exploration Engineering:Rock & Soil Drilling and Tunneling
关键词
深异形地下连续墙
导墙
基坑
垂直度
槽段
钢筋笼
泥浆
接头
hadal depth & abnormal shape underground diaphragm wall
guiding wall
foundation pit
verticality
slot seg-ment
steel reinforcing cage
mud
joint