摘要
文章结合三峡工程建设管理大楼框架设计 ,对部分预应力混凝土框架结构采用应力比“预应力度法”设计的过程及有关参数进行了分析说明 ,供初步接触高效预应力混凝土结构设计人员借鉴。
In connection with the practical design of the construction administrative building for the Three Gorges Project,the partially prestressed concrete frame structure designed by the prestressed level method and its relevant parameters are analysed and explained.The paper could give a reference to those who are involved for the first time in design of high effective prestressed concrete structures.
出处
《西北水电》
2000年第2期21-22,33,共3页
Northwest Hydropower
关键词
部分预应力混凝土框架
设计
三峡工程
建筑物
partially prestressed concrete,frame structure,prestressed level method,stress ratio