摘要
通过介绍汤浦水库东主坝的水管式内部沉降仪的埋设与观测 。
出处
《浙江水利科技》
2000年第4期47-48,共2页
Zhejiang Hydrotechnics
同被引文献12
-
1Forth R A. Ground settlement and sinkhole development due to the lowering of the water table in the Bank Compartment[A]. Proc. 7 Int. Congr. Int. Assoc. Eng. Geol.[C]. 1994, 2933.
-
2Zhang H C. Problem of subsidence caused by coal cutting under the flood-bank[A]. Proceedings of International Congress International Association of Engineering Geology[C]. 1990, 2699.
-
3Cetin H Laman, M Ertunc A. Settlement and slaking problems in the world's fourth largest rock-fill dam, the Ataturk Dam in Turkey,Engineering Geology[J]. 2000,56(3-4): 225-242.
-
4Chugh, Ashok K. Settlement and deformation of embankment dams[A]. Proceedings of the International Conference on Computer Methods and Advances in Geomechanics[C]. 1991, 955.
-
5Papikyan M R. Experience in long-term instrumental observations of settlements of the Shamba Dam,Hydrotechnical Construction (English translation of Gidrotekhnicheskoe Stroitel'stvo)[J]. 1997, 31(3): 178.
-
6俞建义,李秀芸.密云水库大坝沉降监测资料分析[J].北京水利,1997(5):18-22. 被引量:3
-
7王开彬.贮灰坝沉降监测精度及周期初探[J].地矿测绘,1995,11(4):28-29. 被引量:1
-
8崔用龙,陈文华,王小清.乍浦港二期围堤工程沉降观测与反分析[J].浙江水利科技,2000,28(5):59-60. 被引量:1
-
9屠毓敏.长距离顶管穿越海堤时的堤面沉降分析[J].地下空间,2001,21(3):204-207. 被引量:7
-
10J.L.胡斯托,杨超.耶瓜斯坝在施工期间和竣工后的沉降[J].水利水电快报,2002,23(8):18-20. 被引量:1
-
1施练东,郦佳,应立峰.汤浦水库东主坝渗漏分析[J].大坝与安全,2008,22(5):37-38.
-
2沈茂新.论QC小组活动的群众性与科学性[J].经营管理者,2009(17):337-337.
-
3卢烺旻,雷丽春,徐继先.汤浦水库东主坝堆石料碾压试验[J].浙江水利水电专科学校学报,2003,15(3):31-33. 被引量:1
-
4陈金花.白杨河引水工程水库坝体垂直位移监测资料分析[J].水利规划与设计,2015(8):100-102. 被引量:8
-
5陈念水,陈树莲,王卫国.电磁式沉降管在公伯峡面板堆石坝变形观测中的应用[J].西北水电,2007(4):82-86. 被引量:8
-
6卢新民,刘广林,耿凡坤,戴灿炜.新型土石坝沉降监测仪器杆式沉降计的应用[J].水电自动化与大坝监测,2009,33(6):59-61.