6Leon Kos, Joze Duhovnik. A System for footwear fitting analysis [ J ]. International Design Conference Design, 2002(5) :14.
7Lee Barnett, Shahin Rahimifard, Stephen Newman. Distributed scheduling to support mass customization in the shoe industry[J]. International Journal of Computer Integrated Manufacturing,2004,17 (7) :623.