摘要
结合大型粮油加工仓储工程的设计特点,站在设计总包方的角度,从设计输入、设计与施工的衔接、组织与技术接口、设计审查论证、并行设计、设计持续改进等方面介绍了设计控制方法,提出了并行设计的建筑工程设计模式。
In combination with design features of large-scale cereal and oilseed processing and storage engineering, and from the viewpoint of general design contractor,the design control methods were introduced from the aspects of design input, connection of design with construction, interface of organization with technology, design review demonstration, concurrent design and persistent design improving, and the design mode for building engineering with concurrent design was proposed.
出处
《工程建设》
2012年第5期63-68,共6页
Engineering Construction
基金
河南省科技厅软科学研究计划项目(092400410022)
河南省工程咨询业发展战略研究
关键词
加工仓储工程
进度控制
接口管理
并行工程
processing and storage engineering
progress control
interface management
concurrent engineering