期刊文献+

优化配网检修计划工作实施 被引量:2

Optimization of Maintenance Planning Implementation
在线阅读 下载PDF
导出
摘要 简要介绍了配电网和配电调度安排检修工作的状况,指出了如何减少停电次数和时间,增加供电量,进一步提高配网供电可靠性,提高供电企业的经济效益,搞好优质服务。论述了针对对减少停电次数和缩短停电时间,制定相应措施,通过实施配网集中检修,真正做到"一线停电多处干活、一家申请多家工作",最大限度地减少重复性停电、缩短计划停电时间,进而实现提高供电可靠性的目标。 I Introduces the distribution network and distribution scheduling maintenance work status, points out how to reduce the interruption times and time, increase the amount of electric power, further improve the reliability of the network power supply, improve the economic benefits of power supply enterprise, do well excellent service.Below discussed to reduce outage times and shorten outage time, formulate corresponding measures, through the implementation of centralized maintenance of power distribution, truly "line outage at work, a number of job application", to minimize duplication of blackout, shorten the planned outage time, so as to realize the goal of improving power supply reliability.
作者 梁春燕
出处 《装备制造技术》 2012年第11期183-184,共2页 Equipment Manufacturing Technology
关键词 配网检修计划 供电可靠性 集中检修 dispatching work in power distribution efficiency SMS platform
  • 相关文献

参考文献3

二级参考文献1

共引文献90

同被引文献9

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部