中国人寿研发中心F-05地块(数据中心)工程为筏形基础,底板面积约25 000 m2,混凝土用量约33000 m2,且时值冬期施工。施工中通过科学划分流水段、合理安排人员及车辆、精确控制混凝土各项指标,确保了数据中心工程基础底板质量及工期要求。
China Life Center F-05 Block ( Data Center ) project adopts raft foundation whose bottom slab covers an area of about 25000m2 poured with about 33 000m2 concrete in winter. During construction, scientific division of construction section, reasonable arrangement of labor and vehicle and accurate control of various concrete indexes are realized to ensure the foundation slab quality and construction schedule of the project.
出处
《建筑技术》
2012年第11期977-980,共4页
Architecture Technology
关键词
大体积混凝土
基础底板
测温
流水段
浇筑
massive concrete
foundation slab
temperature test
construction section