次同步谐振复杂系统同型机等值 被引量:2

Reduction of Subsynchronous Resonance Complex System With Identical Turbine-Generators
原文传递
导出
摘要 提出了遭受均衡扰动是同型机组的等值条件,基于均衡扰动同型机状态变量相关性发展了一种适合2组以上同型机系统等值的新方法。原同型机系统与等值后同型机系统的特征结构分析结果表明,遭受均衡扰动的同型机系统的模式可以分为冗余模式和公共模式,冗余模式相互抵消,对系统的动态过程不起作用,只有公共模式对系统动态过程起作用。文中给出的均衡扰动同型机等值方法保留了所有公共模式,消去了全部冗余模式。以我国的一个2组同型机的次同步谐振实际复杂系统为例,验证了所提理论和方法的正确性。 It is proposed in this paper that identical generators are subjected to uniform disturbances is the equivalence condition of identical generators,and based on the correlation of state variables of identical generators subjected to uniform disturbances a new equivalence method suitable to power system with more than two identical generators is developed.Eigenstructure analysis results of power system with original identical generators and those of power system with post-equivalence identical generators show that the modes of identical generators subjected to uniform disturbances can be divided into redundant modes and common modes.The redundant modes are cancelled out one another,so they do not impact on dynamic process in power system and only common modes impact on dynamic process in power system.In the proposed equivalence method of identical generators subjected to uniform disturbances all common modes are reserved when all redundant modes are eliminated.Taking an actual complex power system with two identical generators,in which subsynchronous resonance occurs,as the study case,the correctness of both proposed theory and method is verified.
出处 《电网技术》 EI CSCD 北大核心 2012年第11期147-152,共6页 Power System Technology
基金 国家自然科学基金项目(51007032 51107054 51277089) 江苏省科技支撑计划项目(BE2011143) 江苏大学高级人才启动项目(11JDG027)的资助~~
关键词 动态电力系统 同型机组 次同步谐振 power system dynamics identical generators subsynchronous resonance
  • 相关文献

参考文献15

二级参考文献105

共引文献122

同被引文献27

  • 1柴旭峥,刘世宇,姜齐荣,谢小荣,梁曦东.紧凑型线路参数特性对次同步谐振问题的影响[J].电力系统自动化,2007,31(10):11-15. 被引量:8
  • 2Hal M C,Hodges D A. Experience with 500 kV subsynchronous resonance and resulting turbine generator shaft damage at Mohave Generating Station[M].{H}New York:IEEE Press,1976.4-10.
  • 3Xie X,Liu P,Bai K. Applying improved blocking filters to the SSR problem of the Tuoketuo power system[J].{H}IEEE Transactions on Power Systems,2013,(1):227-235.
  • 4Xie X,Guo X,Han Y. Mitigation of multimodal SSR using SEDC in the Shangdu series-compensated power system[J].{H}IEEE Transactions on Power Systems,2011,(1):384-391.
  • 5Singh B,Singm M,Tandom A K. Transient performance of series-compensated three-phase self-excited induction generator feeding dynamic loads[J].{H}IEEE Transactions on Industry Applications,2010,(4):1271-1280.
  • 6Walker D N,Bowler C E J,Baker D H. Torsional dynamics of closely coupled turbine-generators[J].{H}IEEE Transactions on Power Apparatus and Systems,1978,(4):1458-1466.
  • 7Rai D,Faried S O,Ramakrishna G. Hybrid series compensation scheme capable of damping subsynchronous resonance[J].IET Generation Transmission&Distribution,2010,(3):456-466.
  • 8程时杰;曹一家;江全元.电力系统次同步振荡的理论与方法[M]{H}北京:科学出版社,2009170-175.
  • 9刘世宇,谢小荣,王仲鸿.我国火电基地串补输电系统的次同步谐振问题[J].电网技术,2008,32(1):5-8. 被引量:49
  • 10徐政,张帆.神木电厂串补送出方案次同步谐振的计算分析[J].高电压技术,2007,33(12):111-114. 被引量:5

引证文献2

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部