期刊文献+

Flow Calculation of Water Environmental Capacity Controlling Units in a Small Watershed Based on GIS Technology 被引量:1

Flow Calculation of Water Environmental Capacity Controlling Units in a Small Watershed Based on GIS Technology
在线阅读 下载PDF
导出
摘要 [Objeetive] We aimed to calculate the flow of controlling units in a small watershed based on GIS technology. [Method] Hydrologic analysis on Qingyi River was conducted by using ArcGIS9.0, and the controlling units with response of water-land were divided according to the riv- er monitoring sections of Xuchang City; considering the wastewater entering the river and the water from its upper reach, the runoff of controlling sections in the driest month ( with guarantee rate of 90% ) was calculated by means of isoline, runoff coefficient and hydrologic analogy method, and the calculated value of Gaocun Bridge section in Linying was contrasted with the measured value in 2010. [Result] The results showed that the cal- culated value and measured value of Gaecun Bridge section in Linying in the driest month of 2010 were 6.03 and 5.93 m^3/s respectively, with relative error of 1.69%, which revealed that the result of calculated runoff was reasonable. [ Conclusion] The way to divide controlling units was reason- able, and the calculation result of runoff was accurate and can meet the precision of water environment capacity calculation. [Objeetive] We aimed to calculate the flow of controlling units in a small watershed based on GIS technology. [Method] Hydrologic analysis on Qingyi River was conducted by using ArcGIS9.0, and the controlling units with response of water-land were divided according to the riv- er monitoring sections of Xuchang City; considering the wastewater entering the river and the water from its upper reach, the runoff of controlling sections in the driest month ( with guarantee rate of 90% ) was calculated by means of isoline, runoff coefficient and hydrologic analogy method, and the calculated value of Gaocun Bridge section in Linying was contrasted with the measured value in 2010. [Result] The results showed that the cal- culated value and measured value of Gaecun Bridge section in Linying in the driest month of 2010 were 6.03 and 5.93 m^3/s respectively, with relative error of 1.69%, which revealed that the result of calculated runoff was reasonable. [ Conclusion] The way to divide controlling units was reason- able, and the calculation result of runoff was accurate and can meet the precision of water environment capacity calculation.
出处 《Meteorological and Environmental Research》 CAS 2012年第3期42-45,共4页 气象与环境研究(英文版)
关键词 Water environmental capacity Controlling unit Runoff calculation China Water environmental capacity Controlling unit Runoff calculation China
  • 相关文献

参考文献5

二级参考文献39

共引文献40

同被引文献8

  • 1OU Ming-liang,ZHOU Wen-bin,HU Chun-hua.Variation Characteristics of Water Environmental Capacity in Poyang Lake under the Scheduling of Three Gorges Reservoir[J].Meteorological and Environmental Research,2011,2(3):46-48.
  • 2LI XG. Preliminary study on hydrological characteristics of major rivers in Shennongjia forest zone[ D]. Wuhan: Hubei University, 2013.
  • 3ZHANG YL, LIU PZ. Comprehensive guide for water environmen- tal capacity[ M ]. Beijing :Tsinghua University Press, 1991:20 - 23.
  • 4WEN HX. Control and management of urban water resources [ M]. Hangzhou: Zhejiang University Press, 1998: 33 - 34.
  • 5GUAN H. Analysis and application of water environmental capacity in Zhanjiang City [ M]. Beijing: China Environmental Science Press,2005; 132.
  • 6TAN N. Stucly on water environmental capacity at Geiyun section of Haoxi River[ D]. Hangzhou :Zhejiang University,2006.
  • 7State Environmental Protection Administration. Quality standard of surface water environment ( GB3838-2002 ) [S]. Beijing. China Environmental Science Press, 2002.
  • 8张永良.水环境容量基本概念的发展[J].环境科学研究,1992,5(3):59-61. 被引量:122

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部