4AKIO M, TADAO N, KATASE H. Large scale and econo- mical dredging by the world's largest grab dredger 'toshu' ( 1998 ) world dredging [ J ]. Mining Construction, 34 ( 9 ) : 14 - 17.
5STOREK J, RUZICKA M, SPANIEL M. Analysis of the measured force values in the grab dredger cables[ C]. 47th International Conference on Experimental Stress Analysis, 2009.
6OCIMF. Prediction of wind and current loads on VLCCs [ R]. OCIMF,1994.