摘要
针对大多数电厂采用的湿法脱硫技术,论证了脱硫废水及其相关处理工艺,使处理后的废水各项出水指标达到国家有关标准和地方环保标准的要求。
Most of the power plant using the wet FGD technology, it demonstrated a desulfurization wastewater treatment process, made the treated wastewater to achieve the requirements of the relevant national standards and local environmental standards.
出处
《能源与节能》
2012年第10期60-60,70,共2页
Energy and Energy Conservation
关键词
电厂
湿法脱硫
脱硫废水
处理工艺
power plant
wet FGD
FGD wastewater
treatment process