摘要 船坞监测数据对船坞围堰的正常施工起着非常重要的作用,但是由于各种不正确的因素导致监测数据与实际情况不符,而这些异常测值不能通过直观的方法进行剔除,从而对船坞围堰的安全施工监控产生较大的影响,必须进行判断和处理。分别介绍了3σ(拉伊达)、Grubbs(格罗布斯)、Dixon(狄克逊)3种常用排除粗大误差的准则,并应用于具体的船坞围堰安全施工监测。结果表明,这些准则能快速、方便、有效地排除异常测值,为船坞围堰安全施工提供帮助。 The monitoring data of dock cofferdam is very important in the construction of dock. However, some incorrect factors led to the monitoring data does not match the actual situation, while the abnormal value can not be intuitive removed, thus it has a great impact on dock cofferdam construction safety monitoring, So it must be judged and handled. This article introduced 3a, Grubbs and Dixon methods to handle the Gross Error, and applied them to the concrete dock cofferdam construction safety monitoring. The results showed that these methods which provide help to the dock cofferdam construction. They can quickly, easily and effectively handle the abnormal value in some degree.
出处 《岩土工程技术》 2012年第5期226-229,255,共5页 Geotechnical Engineering Technique
关键词 船坞 粗大误差 安全施工监测 异常值 钢板桩 dock Gross Error construction safety monitoring abnormal value steel sheet pile
  • 相关文献

参考文献6

二级参考文献17

  • 1吕昌,郭中伟,邵作义.湿法施工在大型船坞工程中的应用[J].水运工程,2005(8):78-81. 被引量:2
  • 2徐星春,黄敏敏.大型船坞组合钢板桩锤击法施工工艺[J].中国港湾建设,2006,26(6):44-46. 被引量:1
  • 3Wissmann K. Sheet pile tensions in cellular structures [J]. Journal of Geotechnical and Geoenviromental Engineering, 2003, 129(3): 224-233.
  • 4Stuart D M. Project-specific steel sheet piling applications[J]. Practice Periodical on Structural Design and Construction, 2004, 9(4): 194-201.
  • 5Crawford R J. A numerical model for predicting the bending strength of Larssen steel sheet piles[J]. Journal of Constructional Steel Research, 2002, 58 (10): 1361-1374.
  • 6Ou C Y, Liao J T, Lin H D. Performance of diaphragm wall constructed using top-down method[J].Journal of Geotechnical and Geoenvironmental Engineering, 1998, 124(9): 798-808.
  • 7Kim J M, Richard R P. Three-dimensional finite element modelling for consolidation due to groundwater withdrawal in a desaturating anisotropic aquifer system [J]. International Journal for Numerical and Analytical Methods in Geomechanics, 1999, 23(6): 549-571.
  • 8周江文.系统误差的数学处理[J].测绘工程,1999,8(2):1-4. 被引量:23
  • 9周江文.论拟合法则[J].测绘学报,1999,28(4):283-284. 被引量:9
  • 10欧吉坤.一种检测粗差的新方法——拟准检定法[J].科学通报,1999,44(16):1777-1781. 被引量:33

共引文献56

同被引文献9

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部