摘要
在水力模型试验的基础上,对新疆HDBT电站进水口布置方案的运行流态、水头损失、工程投资等进行比较,提出了较优的电站进水口布置方案,满足了工程设计的要求。本项目试验研究成果得到了工程建设的采用,可供类似工程设计和运行参考。
Based on hydraulic model tests, the intake layout scheme of Xinjiang HDBT power is optimized and the re- quirement of engineering design is satisfied in this paper by comparing the operation flow pattern and head loss and project investment. The test results are used by project construction, which would be of referential value for other projects design and operation.
出处
《水科学与工程技术》
2012年第5期60-63,共4页
Water Sciences and Engineering Technology