期刊文献+

高墩多跨连续刚构桥最优合龙顺序选择 被引量:9

The optimal selection of the multiple-span continuous rigid frame bridge with high pier's closure order
在线阅读 下载PDF
导出
摘要 高墩多跨连续刚构桥成桥后,混凝土的收缩、徐变以及温度的变化都会对主体结构的变形和内力产生较大的影响.结合工程实例,进行了合龙顺序的优化分析.分析结果表明:合理的合龙顺序既能保证高墩多跨连续刚构桥的成桥线形满足设计要求;也能保证桥梁在长期运行时,其承载能力满足实际要求. Concrete shrinkage and temperature change have great effects on the deformation and internal force of girder and pier after the multiple-span continuous rigid frame bridge with high pier has finished,combined with the examples of closure order optimization analysis.The results show that the reasonable closure order can be obtained to sure the multiple-span continuous rigid frame bridge with high pier,which can bear stronger negative bending moment,the bridge linear satisfies the design requirements.
出处 《交通科学与工程》 2012年第3期37-41,共5页 Journal of Transport Science and Engineering
关键词 高墩多跨连续钢构桥 合龙顺序 顶推力 优化分析 the multiple-span continuous rigid frame bridge with high pier closure order jacking force optimization analysis
  • 相关文献

参考文献9

二级参考文献22

共引文献235

同被引文献57

引证文献9

二级引证文献52

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部