摘要
文中介绍了丰满水电站的运行情况 ,5 0a来 ,电站经不断的扩机和设备改造 ,容量已翻一番 ,在更新改造中 ,还对大坝进行了全面加固 ,消除了大坝的主要缺陷 ,保证了电站安全稳定运行。电站在电网中发挥很大的作用 。
This paper narrates the operation status of Fengman Hydroelectric station.50 years till now,the station had passed through uninter-rupted generating-set expansions and equipment reforms,the total capacity has been doubled.In the renewing reforms,the dam had been overall reinforced,the major defects of the dam had been cleared up,thus the safety and stable operation of the station are ensured.The station taked very great effect in the power network,and have gotten evident economic and social benefits.
出处
《东北电力技术》
2000年第4期6-9,30,共5页
Northeast Electric Power Technology