摘要
地下电站厂房施工中,桥机梁岩台基础开挖是厂房施工的重点和难点,介绍了三峡地下厂房工程中的成功实践,阐述了其爆破施工方案,爆破试验,主要施工方法及爆破参数的选取方案,介绍了钻孔精度的控制和爆破时机的选择方法,经精心设计、严谨施工,工程桥机梁岩台基础开挖爆破达到设计要求。
In the underground powerhouse construction, the rock foundation excavation of bridge-machine beam is one of the difficulties in building construction. The successful practice in the underground powerhouse of three Gorges Project was introduced, including the blasting scheme, blast test and the main construction methods and the selection of blast parameters. With an elaborate design and strict construction, the blasting excavation of rock foundation meets the design requirements.
出处
《爆破》
CSCD
北大核心
2012年第3期65-69,共5页
Blasting
关键词
地下厂房
桥机梁岩台
开挖技术
underground powerhouse
rock foundation of bridge-machine beam
excavation technology