摘要
排水系统的规模与布局是进行总体规划时必须要论证的问题 ,但目前大多数情况只基于定性分析 ,系统可靠性较低。介绍了动态规划法定量分析与计算方法 。
The scale and layout of wastewater discharge system must be proved in the general urban planning. But nowdays in most case it is qualitative, so the reliability is low. A method and calculation of dynamic quantitative analysis of wastewater discharge system are presented; it will be practical for general urban planning.
出处
《给水排水》
CSCD
北大核心
2000年第9期37-40,共4页
Water & Wastewater Engineering
基金
国家自然科学基金资助项目!(596780 4 7)