摘要
以武汉市地铁站2号线积玉桥站为例,在分析现有交通组织局限性的基础上,运用单向交通、公交改线、施工段设计等方法对施工周边路网进行交通组织优化设计。最后选用Transtar软件对设计方案进行评价,得到相关数据,验证设计方案的可行性。
Taking Jiyu Bridge Station of Wuhan Subway Line 2 as an example, based on analyzing the limita tions of existing traffic organization scheme, this paper organizes the traffic running in the field of construction using methods such as oneway traffic, bus undesirable and construction section design. Finally, the design scheme is evaluated though Transtar software and the relevant data is gained. The feasibility of the design scheme is verified.
出处
《交通标准化》
2012年第17期13-16,共4页
Communications Standardization
基金
武汉科技大学校基金(2010XZ031)