大型工程项目的雷电灾害风险评估方法探讨 被引量:4

Discussion on risk assessment of lightning disaster in large engineering project
在线阅读 下载PDF
导出
摘要 大型工程项目周期长、投资高、风险大、技术工艺复杂,遭受雷击的可能性及危害程度大,科学的雷电灾害风险评估可以有效的预防雷电风险,是平衡防雷设施投资及减少雷电灾害损失的重要手段。文章对大型工程项目进行了分析,从评估对象的角度讨论大型工程项目进行雷电灾害风险评估的步骤,从而得出结论:大型项目应按功能分区讨论,每一区域宜选用综合整体评估与突出重点单体评估相结合的方法。 Due to the long period, high cost, big risk and complicated techniques, large engineering projects deserve lightning stroke with high possibility and great degree. Scientific risk assessment for lightning disaster can effectively prevent lightning risk, which is the important means for balancing investing mine facilities and reducing lightning losses. This paper analyzes the large engineering project and discusses the steps of risk assessment for lightning disaster from perspective of evaluation objects. The conclusions show that the large engineering project should be discussed according to function partition, and every partition should be combined methods of comprehensive whole assessment and intensive individual assessment.
作者 冯鹤
机构地区 河北省防雷中心
出处 《气象水文海洋仪器》 2012年第3期121-123,128,共4页 Meteorological,Hydrological and Marine Instruments
关键词 大型工程项目 雷电灾害风险评估 评估对象 large engineering project risk assessment of lightning disaster evaluation objects
  • 相关文献

参考文献10

二级参考文献20

共引文献70

同被引文献40

引证文献4

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部