摘要
介绍了天荒坪抽水蓄能电站投产十余年以来主机设备的部分部件的改造工作,分析了各项设备或部件改造的原因、措施以及改造后的效果,可以为抽水蓄能电站运行、检修提供参考,也可为主机设备制造厂提供一些有益的信息和思路。
Renovation of partial components of main machines of Tianhuangping Pumped Storage Power Station after operation of more than 10 years is described. Reasons, measures and effects of equipments or components renovated are analyzed, providing pumped storage power stations with reference for operation and repair as well as manufacturers of main machines with useful data and idea.
出处
《西北水电》
2012年第S01期218-223,共6页
Northwest Hydropower
关键词
旋转油盆
甩油
导叶上、下端轴密封
摩擦装置
位置开关
进水阀
工作密封盘根
枢轴密封
发电电动机制动器
Rotary oil sump
oil rejection
shaft sealing at both upper and lower ends of wicket gate
friction devices
position switch
inletvalve
stuffing for operating sealing
shaft sealing
generating motor brake