关于大黑汀渠首电站水轮机转桨改定桨可行性及必要性的探讨

Discussion about Feasibility and Necessity of Turbine Change from Adjustable Blade Propeller to Fixed Blade Propeller,Daheiting Canal Head Hydropower Station
在线阅读 下载PDF
导出
摘要 根据大黑汀渠首电站实际运行情况及现场试验结果,对电站轴流转桨水轮发电机组按能量指标、效益指标进行了分析,论述了转桨改定桨方式运行及转轮改造的必要性及可行性。 According to actual operation and site test results of Daheiting Canal Head Hydropower Station, the axial flow adjustable blade propeller turbine of the Station is analyzed in terms of energy and benefit indexes respectively, demonstrating the necessity and feasibility of the turbine operation with change of the adjustable blade propeller to the fixed blade propeller as well as of the runner renovation of the turbine.
出处 《西北水电》 2012年第S01期208-211,共4页 Northwest Hydropower
关键词 转轮 浆叶 改造 漏油 水轮机 Runner blade renovation oil leakage turbine
  • 相关文献

参考文献7

  • 1水电站机电设计手册编写组.水电站机电设计手册[M].水利电力出版社,1983.
  • 2东北水利水电专科学校史振声主编.水轮机[M].北京:水电出版社.1992.
  • 3肖慧民主编.中小型水轮发电机组运行与检修[M].北京:中国电力出版社,2007.
  • 4季盛林,刘国柱主编,水轮机[M].2版.北京:水利电力出版社,1986.
  • 5GB/T15468-2006.水轮机基本技术条件[S].北京:中国标准出版社,2006.
  • 6GB7894-87,水轮发电机基本技术条件[S].北京:中国标准化出版社.1987.
  • 7GB8564-88,水轮发电机组安装技术规范[S].北京:中国标准化出版社,1988.

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部