充填法两步回采采场结构参数优化 被引量:14

Stope Structure Parameters Optimization for Backfill by Two-step Stoping
在线阅读 下载PDF
导出
摘要 后观音山铁矿露天转地下交接工作已基本完成,为了选取合理的采场结构参数,根据矿岩与充填体力学参数,运用ANSYS有限元分析软件,对充填法两步回采的采场结构参数进行了优化。利用ANSYS模拟不同采场的结构参数、采场顶板厚度及多采场回采模式下的采场应力状态和变形情况,综合分析模拟结果,最终确定最优方案。模拟结果表明:采场结构参数为20 m矿柱、30 m矿房的模型为最佳方案。该结果在矿山应用中取得了很好的效果,确保了地下矿产资源回采的安全性和高效性。 The transition from open-pit to underground mining has been completed in Houguanyin Mountain Iron Mine. The structure parameters were optimized with ANSYS (finite element analysis) software for the stope using backfill method with two-step stoping, based on mechanical parameters of rock mass and filling body. Structure parameters for various stopes, stope roof thickness, as well as the stope stress state and stope shape deformation under multi-stope operation were all simulated with ANSYS. The optimal parameters have been established based on the comprehensive analysis results. Results showed that the optimal stope should be with pillars and rooms, respectively, 20 meters and 30 meters long. This design has got good result in the mine application, ensuring the safety and efficiency in underground mineral exploitation.
出处 《矿冶工程》 CAS CSCD 北大核心 2012年第4期1-4,共4页 Mining and Metallurgical Engineering
基金 科技部"十一五"科技支撑计划课题(2008BAB32B03)
关键词 两步回采 充填 结构参数 数值模拟 ANSYS two-step stoping backfill structure parameters numerical simulation ANSYS
  • 相关文献

参考文献12

二级参考文献76

共引文献302

同被引文献93

引证文献14

二级引证文献75

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部