110kV系统失地过电压问题分析与处理 被引量:1

110 kV Over-voltage Analysis and Its Treatment While Grounding Lost
在线阅读 下载PDF
导出
摘要 包头供电局鹿钢变电站2台主变压器采用1台主变压器220 kV侧及110 kV侧中性点直接接地运行、另1台中性点经间隙接地运行的方式,系统故障、接地变压器跳闸后系统失去接地,产生了高零序过电压。提出了将2台主变压器220 kV侧及110 kV侧中性点直接接地运行的解决办法。实施后,解决了系统发生故障、接地主变压器跳闸后,110 kV系统无接地点及系统过电压问题,降低了变压器承受的故障电流。 Baotou Power Supply Bureau Lugang Substation has two main transformers, in operation with one transformer's neutral point grounding directly both in 220 kV side and 110 kV side, the other one's type is gap grounding. When system is fault, grounding transformer tripping and system losing ground, high zero-sequence over-voltage appeared. Put forward the method for both transformer's 220 kV and 110 kV neutral points grounding directly. After implementation, when the earthed transformer tripped while system is fault, the phenomenon that 110 kV system have grounding and system's over-voltage never occured and the fault current in transformer was reduced.
机构地区 包头供电局
出处 《内蒙古电力技术》 2012年第4期54-57,共4页 Inner Mongolia Electric Power
关键词 220KV变电站 中性点偏移 直接接地 间隙接地 失地 零序过电压 220 kV substation neutral point offset grounding gap grounding grounding lost zero-sequence voltage
  • 相关文献

参考文献3

  • 1电力行业继电保护标准化委员会.DIJT559--2007220kV~750kV电网继电保护装置运行整定规程[s].北京:中国电力出版社,1998:10—11.
  • 2崔家佩,孟庆炎,陈永芳,等.电力系统继电保护与安全自动装置整定计算[J].中国电力出版社,2006:11-13.
  • 3贺伟,杨志武,刘江.大集中模式的变电站五防管理系统分析[J].内蒙古电力技术,2009,27(4):52-54. 被引量:7

二级参考文献2

共引文献6

同被引文献2

  • 1叶郁葱.1lOkV电缆线路故障及施工管理要点分析.中国电业(技术版),2012(04):101-102.
  • 2陈东,输电线路雷击故障点的分析与诊断[J].中国电业(技术版),2012(01):132-133.

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部