摘要 从一则砖混结构楼房爆破拆除实例 ,发现在爆破拆除该类建筑物的设计与实施中存在问题 ,为此提出改进设计。认为对于整体性好、刚度大的砖混结构楼房的爆破拆除 ,在条件允许时应多处理几层以增加爆高 ,在楼房的倾倒背面也应布置爆破切口 ,还应采用分段雷管来调整其起爆顺序 ,这样才能达到更好的效果。 An example of dismantling a brick concrete structure building by blasting method is analyzed,some problems arisen in the process of designing and constructing are illustrated An improved design is proposed for blasting demolition of this kind of brick concrete structure with good overall performance and great stiffness Wherever possible, it is desirable to increase blasting height to arrange blasting cut on the back of building in direction of dumping the building blasted and to adjust the initiation order by using sectional blaster cap
作者 胡文军
出处 《江汉石油学院学报》 CSCD 北大核心 2000年第1期26-27,30,共3页 Journal of Jianghan Petroleum Institute
关键词 砖混结构 楼房 爆破拆除 改进设计 brick concrete structures storied house blasting demolition improved design
  • 相关文献

参考文献4

  • 1张斌,刘先魁,李伟.八层住宅楼的爆破拆除[J].爆破,1999,16(2):66-68. 被引量:2
  • 2谢先启,爆破,1998年,15卷,增刊,77页
  • 3朱建新,爆破,1998年,15卷,增刊,6页
  • 4龙维祺,特种爆破技术,1993年,32页

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部