南水北调东线睢宁二站工程总体布置与设计 被引量:4

General Layout Design for Suining Pump Station Ⅱ on the Eastern Route of the South-to-North Water Transfer Project
在线阅读 下载PDF
导出
摘要 根据南水北调东浅睢宁二站场地自然条件,结合施工、运行管理等方面进行综合设计,使得泵站中各建筑物布置紧凑、合理。从设计角度,对主泵站、上下游引河、基坑支护、清污机桥及附属桥梁等方面全面阐述了泵站工程总体布置设计。 The yard's natural conditions, construction,operation and management and other aspects are considered in the design of the Suining pump station Ⅱ. The buildings are arranged compactly and reasonably. From the angle of design, the general layout design of pump station, including the main pumping station, downstream approach channel, foundation pit, bridge of clean-feeulance machine and ancillary bridge are elaborated in the round by the author.
出处 《南水北调与水利科技》 CAS CSCD 北大核心 2012年第A02期3-4,共2页 South-to-North Water Transfers and Water Science & Technology
关键词 南水北调 泵站 总体布置 设计 the South-to-North Water Diversion Project pump general layout design
  • 相关文献

参考文献9

  • 1GB50265-2010,泵站设计规范[S].
  • 2SI,265-2001水闸设计规范[S].
  • 3SL191-2008,水工混凝土结构设计规范[S].
  • 4SI.203-97,水工建筑物抗震设计规范[S].
  • 5DL5077-1997.水工建筑物荷载设计规范[S].[S].,..
  • 6JTGD60-2004.公路桥涵设计通用规范[S].[S].,..
  • 7JTG 1362-2004,公路钢筋混凝土及预应力混凝土桥涵设计规范[s].
  • 8JGJ79-2002.建筑地基处理技术规范[S].,2002..
  • 9GB50011-2010,建筑抗震设计规范[S].

共引文献5084

同被引文献30

  • 1陈燕.大体积混凝土的温度效应计算理论与整体分析[J].广东土木与建筑,2005,12(12):6-8. 被引量:1
  • 2SL191-2008,水工混凝土结构设计规范[S].
  • 3SL203-97水工建筑物抗震设计规范[S].2004.
  • 4GB50011-2010,建筑抗震设计规范[S].
  • 5GB50010--2010混凝土结构设计规范[S].
  • 6GB50265-2010,泵站设计规范[S].
  • 7SL203-97.水工建筑物抗震设计规范[S].[S].,..
  • 8SL265-2001.水闸设计规范[S].[S].,..
  • 9DL5077-1997.水工建筑物荷载设计规范[S].[S].,..
  • 10GB18306-2001,中国地震动峰值加速度区划图[S].

引证文献4

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部