期刊文献+

锚泊辅助动力定位系统单缆失效影响研究 被引量:9

Research on the impact of one line failure for a mooring assisted dynamic positioning system
在线阅读 下载PDF
导出
摘要 针对半潜式钻井平台锚泊辅助动力定位系统在海上作业时可能会出现的单缆失效情况。以一艘半潜式平台为例,设计锚泊辅助动力定位系统。通过全动态时域模拟,研究不同的单缆失效模式对半潜式平台锚泊辅助动力定位系统功率消耗、定位精度、缆绳张力等的影响。根据分析结果,在极端海况下,松弛锚泊辅助动力定位系统的背风缆有助于降低定位系统的功率消耗,提高定位精度和系统的安全性,从而为锚泊辅助动力定位系统的工程应用提供一些参考。 For a semi-submersible platform, one mooring line may fail when the mooring-assisted dynamic positioning system works in the sea. As an example, a semi-submersible platform has been considered and a mooring-assisted dynamic positioning system has been designed. By using the time domain simulation, the impact of one mooring line failure on the offsets and power utilization of the plat- form will be analyzed. From the analysis result, it is suggested that under severe conditions, loosing the tension of the leeward lines can reduce power consumption, improve positioning accuracy and the safety of the positioning system, which will be helpful to the further engineering applications of the mooring-assisted dynamic positioning system.
出处 《海洋工程》 CSCD 北大核心 2012年第3期29-34,共6页 The Ocean Engineering
基金 国家自然科学基金资助项目(51179103) 工信部高技术船舶科研基金"深海半潜式钻井平台工程开发"资助项目
关键词 锚泊辅助动力定位 单缆失效 时域模拟 半潜式平台 mooring-assisted dynamic positioning system one mooring line failure time domain simulation semi-submersible plat- form
  • 相关文献

参考文献13

  • 1A B Albers,A A Merchant.The hydrodynamic model testing for closed loop DP assisted mooring[C]∥Offshore Technology Con-ference.1996.
  • 2张炳夫.深水锚泊和动力定位联合定位系统设计研究[D].大连:大连理工大学,2009.
  • 3DNV.Offshore standard DNV-OS-E301:Position mooring[S].2010:58-59.
  • 4Johan Wichers,Van Dijk.Benefits of using assisted DP for deepwater mooring systems[C]∥Offshore Technology Confer-ence.1996.
  • 5Chris Jenman.Mixing dynamic positioning with moorings[C]∥Dynamic Positioning Conference.2005.
  • 6Sue Wang.On the assessment of thruster assisted mooring[J].Offshore,2010.
  • 7孙攀.深海半潜式钻井平台锚泊辅助动力定位系统研究[D].上海:上海交通大学,2011.
  • 8Asgeir J Sφrensen,Jann Peter Strand,Thor I Fossen.Thruster assisted position mooring system for turret-anchored FPSOs[C]∥International Conference on Control Applications.1999.
  • 9李勇跃,王磊,孙攀.深水半潜式钻井平台动力定位最优作业方向研究[J].海洋工程,2011,29(1):26-31. 被引量:11
  • 10黄剑,朱克强.半潜式平台两种锚泊系统的静力分析与比较[J].华东船舶工业学院学报,2004,18(3):1-5. 被引量:8

二级参考文献13

  • 1AGARWAL A K,JAIN A K.Dynamic behavior of offshore spar platforms under regular sea waves[J].Ocean Engineering,2003(30):487-516.
  • 2Asgeir J Sorensen, Beret Leira, Jann Peter Strand, et al. Optimalsetpoint chasing in dynamic positioning of deep-water drilling and intervention vessels[J]. Int. J. Robust Nonlinear Control, 2001, 11 : 1187-1205(DO1: 10. 1002/rnc. 602).
  • 3Jon Holvik, Kongsberg Simrad. Basics of dynamic positioning[C]// Dynamic Positioning Conference. 1998.
  • 4MARIN.DPSEMI软件用手册[M].
  • 5Ir F van Walree. Mathematical Model of DPSim: A Simulation Program for Dynamically Positioned Vessels[ R]. MARIN: 47940-4-RD, 1989.
  • 6U Nienhuis. Simulations of low frequency motions of dynamically positoned structures[C]//RINA Spring Meeting. 1986.
  • 7API. API recommended practice for design and analysis of stationkeeping systems for floating structures[ M]. DRAFT, 1994.
  • 8T M Smith, M C Chen, A M Radwan. Systematic data for the preliminary design of mooring systems[ A]. Proceedings of the fourth International Offshore Mechanics and Arctic Engineering Symposium[C]. 1985, (1):403 - 407.
  • 9Russell J Smith, Colin J MacFarlane. Statics of a three component mooring line[J] .Ocean Engineering,2001,28:899- 914.
  • 10Y T Chai, K S Varyani, N D P Barltrop. Semi - analytical quasi - static formulation for three-dimensional partially grounded mooring system problems[J]. Ocean Engineering, 2002,29: 627 - 649.

共引文献40

同被引文献50

引证文献9

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部