2010年,欧洲海上风电开发进一步提速,同时,我国也实现了第一座海上风电场的并网发电,并顺利完成了第一轮海上风电特许权项目的招标,开启了我国海上风电发展的大幕。尽管现在海上风电装机容量占风电总装机容量的份额还比较小,但是未来大规模开发的趋势不可避免。本文总结了海上风电场建设和运行过程中影响其成本收益的主要因素,从中获得启示,提出了一些政策建议,以保障我国海上风电更好的发展。
In 2010,offshore wind power has been boo-ming in Europe.At the same time,in China,the first offshore wind farm achieved grid-connected and the first round of offshore wind power concession projects bidding was carried out successfully in 2010.Though total installed capacity of offshore wind power is still relatively small,its trend of large-scale development is inevitable.This paper summarizes some major factors that affect the cost-benefit of offshore wind farm,thus give some policy recommendations for the Chinese relevant department in the process of offshore wind power development.
出处
《特区经济》
2012年第8期224-226,共3页
Special Zone Economy
基金
国家自然科学基金41001084资助
关键词
海上风电
成本收益
政策建议
Offshore Wind Power
Cost-Benefit
Policy Recommendations