期刊文献+

十字交叉吊杆拱桥支座更换顶升方案研究 被引量:3

Research on Jacking Plans for Replacement of Supports of Crossing Suspender Arch Bridge
在线阅读 下载PDF
导出
摘要 对某钢管混凝土十字交叉吊杆拱桥支座更换顶升方案进行分析研究,采用有限元软件分析并探讨主梁与梯道梁相接处的钢板连接、主梁与主拱相交处的橡胶圈、单点顶升与多点顶升、顶升位置、附加支撑以及顶升最大高度对拱梁受力性能的影响,得出相应结论及建议,为同类型桥梁施工提供借鉴。 This paper analyzes and researches jacking plans for replacement of supports of some steel tube concrete crossing suspender arch bridge,employs finite element software to analyze and probe into influences of connection of steel plates at joint between girder and stairway beam,rubber rings at the crossing between girder and main arch,single-point jacking and multi-point jacking,jacking position,additional supports and the max.jacking height on stressed performance of arched beams and obtains corresponding conclusions and suggestions,providing a reference for construction of bridges of the same type.
机构地区 重庆交通大学
出处 《公路交通技术》 2012年第4期70-73,78,共5页 Technology of Highway and Transport
基金 重庆交通大学(桥梁)结构工程重点实验室开放基金(CQSLB-Z09-8)
关键词 十字交叉吊杆拱桥 钢管混凝土 支座更换 主梁顶升 受力性能 crossing suspender arch bridge steel tube concrete replacement of supports girder jacking stressed performance
  • 相关文献

参考文献10

二级参考文献6

共引文献69

同被引文献23

引证文献3

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部