天生桥一级水电站混凝土面板堆石坝位移监测 被引量:2

Displacement Monitoring For TSQ-I CFRD
在线阅读 下载PDF
导出
摘要 天生桥一级电站混凝土面板堆石坝的填筑坝体位移监测通过水管式沉降仪和水平位移计进行 .坝体内安装了 50支水管式沉降仪 (瑞典盒式 )、31支水平位移计 (铟钢丝型伸缩仪 )和 2 8支总压力计 .监测结果表明 ,施工期末 (1999年 3月 )最大坝体沉降是 2 .94 m,相当于坝体高度的 1.7% ,施工期末堆石坝变形模量 Erc平均 4 5MPa,为最大坝体变形 ,促使上游边坡出现裂缝以及面板浇筑前上游边坡明显沉降 . For TSQ ⅠCFRD the embankment displacements are being monitored by hydrostatic settlement cells and horizontal displacement meters.Settlements and horizontal displacements measured during the construction period and partial reservoir filling are presented.Deformation of the dam body has caused cracks in the upstream slope,a gap between the face slab and the cushion zone slope and significant upstream slope ,a gap between the face slab and the cushion zone slope and significant upstream slope settlements before pouring the face slab.These interesting construction features and related remedial treatments are described and analyzed in relation to the dam performance.
出处 《水利水电技术》 CSCD 北大核心 2000年第6期34-38,共5页 Water Resources and Hydropower Engineering
关键词 位移 监测 面板堆石坝 沉降 水电站 rockfill dam,instrumentation,monitoring,settlement cell,extensometer,settlement,crack,repair
  • 相关文献

同被引文献18

引证文献2

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部