摘要
简述灯泡贯流式水轮发电机组的发展里程 ,浅析了恶滩水电站扩建工程采用灯泡贯流机组 (最大水头 31.4m ,转轮直径 6 .8m ,单机容量 75MW )的制造难度及可行性。
The course of development bulb turbine unit has been simply discussed in this paper. The difficulties of manufacturing bulb turbine unit with the maximum head of 31.4 m and single_unit capacity of 75 MW and runner diameter of 6.8m for Etan hydropower station, and the feasibility of using bulb turbine unit have been analysed too.
出处
《红水河》
2000年第2期41-44,共4页
Hongshui River
关键词
灯泡贯流式机组
发展
恶滩水电站
可行性
扩建
WT5BZ] application
bulb turbine unit
feasibility
Etan hydropower station