通过工程实例介绍了采用大吨位压桩机、预钻孔、开口管桩及桩底压浆等措施在高层建筑基础中应用静压入岩桩的方法.
An engineering case is introduced to illustrate the application of static pressure pile for rocky ground in construction of high-rise building. The heavy-duty piledriver, preboring, non-sabot pipe pile and grouting at the bottom of pipe pile were adopted.