期刊文献+

预应力混凝土桥悬臂施工监测控制技术 被引量:1

Monitoring and Control Technology for Cantilever Construction of Prestressed Concrete Bridge
在线阅读 下载PDF
导出
摘要 介绍预应力梁式桥悬臂施工控制的内容、方法,对预应力混凝土梁式桥的内力监测元件布置及应力监测数据误差的产生原因和影响因素进行了分析,对温度、预应力的监测以及施工预拱度的控制、线形控制进行了细致、深入的探讨与总结,以供广大工程技术人员参考。 By analyzing the internal force monitoring component layout and the causes and influencing fac- tors producing stress monitoring data errors, the paper introduces detailed methods for momintoring and control of prestressed beam bridge cantilever construction. The author further gives detailed and in-depth discussion and summarization on temperature control, prestress monitoring, construction of pre-camber control and linear control. This article provides a good reference for engineers and technicians.
作者 刘明
出处 《交通标准化》 2012年第16期129-133,共5页 Communications Standardization
关键词 预应力 梁式桥 悬臂施工 施工监控 prestressing force beam bridge cantilever construction construction supervision and monitoring
  • 相关文献

参考文献4

二级参考文献10

共引文献34

同被引文献2

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部