摘要
文章结合广西桂平二线船闸建设项目航道交通大桥工程实例,阐述了桥梁高标号混凝土泵送施工的工艺流程及要点,并提出了相应的施工质量控制措施。
Combined with the actual engineering case of Waterway Traffic Bridge in Guangxi Guiping second-line shiplock construction project,the article described the technical process and keypoints of bridge high-grade concrete pumping construction,and proposed the corresponding construction quality control measures.
出处
《西部交通科技》
2012年第7期75-77,共3页
Western China Communications Science & Technology
关键词
桥梁
高标号混凝土
泵送施工技术
Bridge
High-grade concrete
Pumping construction technology