期刊文献+

Creating a Business Process Monitoring System "A-IOMS" for Software Development

Creating a Business Process Monitoring System "A-IOMS" for Software Development
在线阅读 下载PDF
导出
摘要 In this paper, the authors establish the Amalab-integrated operation management system (A-IOMS) as a new way to carry out software development and monitor business processes. This new system puts the previously constructed the Amalab-project planning navigation system (A-PPNS) to work throughout the entire organization. The A-IOMS has several key elements. Specifically, the authors have constructed: (1) a Hi-reliability estimation system diagnostic tool that pinpoints problems with software development estimates and offers a prescription for resolving them; (2) a QA table map that allows for an immediate, thorough, and consistent quality assurance process; (3) a system for sharing software development schedules throughout the organization; and (4) a technological asset completion reporting system for passing down and cultivating software development technologies and strategically expanding them. The authors verified the effectiveness of the A-IOMS at company A, a systems integration company, and the given outcomes were obtained.
出处 《Chinese Business Review》 2012年第6期588-595,共8页 中国经济评论(英文版)
关键词 software development business process A-IOMS project management 软件开发技术 监控系统 业务流程 可靠性估计 经营管理系统 导航系统 项目规划 诊断工具
  • 相关文献

参考文献12

  • 1Amasaka, K. (2005). Constructing a customer science application system "CS-CIANS"--Development of a global strategic vehicle "Lexus" utilizing New JIT. WSEAS Transactions on Business and Economics, 2, 135-142.
  • 2Galorath, D., & Evans, W. (2006). Software sizing, estimation, and risk management. Auerbach Publications.
  • 3Kato, K. (2006). Visualization of work processes on a research industry (in Japanese) (Graduation thesis, Aoyama Gakuin University).
  • 4Kojima, T., & Amasaka, K. (2011). The total quality assurance networking model for preventing defects: Building an effective quality assurance system using a total QA network. International Journal of Management and Information Systems, 15(3), 1-10.
  • 5Mihara, R., Nakamura, M., Yamaji, M., & Amasaka, K. (2010). Study on business process navigation system "A-BPNS", International Journal of Management and Information Systems, 14(2), 51-58.
  • 6Mittas, N., & Angelis, L. (2010). Visual comparison of software cost estimation models by regression error characteristic analysis, Journal of Systems and Software, 83(4), 621-637.
  • 7Nakamura, M., Enta, Y., & Amasaka, K. (2011), Constructing a model to assess the success of information sharing between customers and vendors in software development. Proceedings of International Conference on Business Management 2011, Miyazaki Sangyo-Keiei University, Japan (pp. 109-118).
  • 8Otsuka, H. (2008). System development methodology making effective use of intellectual property. Unisys Technology Review (in Japanese), 28(2), 3-14.
  • 9Ross, J., Weill, P., & Robertson, D. (2006). Enterprise architecture as strategy." Creating a foundation for business execution. Harvard Business Press.
  • 10Sakai, H., Waji, Y., Nakamura, M., & Amasaka, K. (2011). Establishment of"A-PPNS": A navigation system for regenerating the software development business. IndustrialEngineering and Management Systems, 10(1), 44-54.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部