摘要
结合动车组四级、五级检修,制定了高压设备箱的检修方案,为保证动车组安全可靠运营、缩减检修周期、节约检修及维护成本提供依据。
In light of the Grade 4 and Grade 5 inspection and repair of multiple units,the inspection and repair scheme for high voltage equipment box is set up,so as to provide basis for ensuring the safe and reliable operation of multiple units,reduction of inspection and repair period,saving of cost of inspection,repair and maintenance.
出处
《铁道车辆》
北大核心
2012年第7期41-42,6,共2页
Rolling Stock
关键词
CRH2型动车组
高压设备箱
检修
CRH2 multiple units
high voltage equipment box
inspection and repair