期刊文献+

渠式生化反应器处理城市污水的研究 被引量:1

Research on the Treatment of Urban Wastewater in Canal Bioreactor
在线阅读 下载PDF
导出
摘要 采用渠式生化反应器、交替好氧缺氧工艺处理城市污水 ,当水力停留时间为 1 0 h,空气阀开闭周期为 3 0 / 3 0 min时 ,COD的去除率达 86.8% ,T-N的去除率达 63 .6%。在相同的反应条件下 ,流速对处理效果的影响不大。试验结果表明利用污水渠处理城市污水在技术上是可行的。 A canal bioreactor was designed and alternating aerobic-anoxic process was employed to dispose of urban wastewaster.when the hydraulic retention time-air on/off period were bept at 10h and 30/30min respectively,86.8% of COD and 63.6% T-N were removed.The influence of velocity of flow was discussed,the results indicated that velocity of flow had no obvious effects on treatment performance,the research results also showed that canal bioreactor was technologically suitable for treating urban wastewater.
出处 《环境保护科学》 CAS 2000年第2期21-23,共3页 Environmental Protection Science
关键词 城市污水 渠式生化反应器 废水处理 Alternating aerobic-anoxic process Canal bioreactor Urban wastewater Velocity of flow
  • 相关文献

参考文献3

共引文献77

同被引文献17

  • 1国家环境保护局《水和废水监测分析方法》编委会.水和废水监测分析方法[M].北京:中国环境科学出版社,1989.311-313.
  • 2Joanna surmacz-Gorska,Andrzej Cichon,Korneliusz Miksch.Nitrogen removal from wastewater with high ammonia nitrogen concentration via shorter nitrification and denitrification[J].Wat Sci Tech,1997,36(10):73-78
  • 3Hellinga C,Schellen A A J C,Mulder J W,et al.The Sharon process:an innovative method for nitrogen removal from ammoniumrich wastewater[J].Wat Sci Tech,1998,37(9):135-142
  • 4Zhang ShaoYuan,Wang JuSi,Jiang ZhaoChun,et al.Nitrite accumulation in an attapulgas clay biofilm reactor by fulvic acids[J].Bioresource Technology,2000,73:91-93
  • 5Ruiz G,Jeison D,Chamy R.Nitrification with high nitrite accumulation for the treatment of wastewater with high ammonia concentration[J].Wat Res,2003,37(6):1371-1377
  • 6van Kempen R,Mulder J W,Uijterlinde C A,et al.Overview:Full scale experience of the sharon process for treatment of rejection water of digested s1udge dewatering[ J].Wat Sci Tech,2001,44(1):145-152
  • 7Hao Oliver J,Huang Jason.Alternating aerobic-anoxic process for nitrogen removal:process evaluation[J].Wat Environ Res,1996,68( 1 ):83-93
  • 8Huang Jason and Hao Oliver J.Alternating aerobic-anoxic process for nitrogen removal:dynamic modeling[ J ].Wat Environ Res,1996,68(1):94-104
  • 9Paul E,Plisson-Saune S,Mauret M,et al.Process state evaluation of alternating oxic-anoxic activated sludge using ORP,pH and DO[J].Wat Sci Tech,1998,38(3):299-306
  • 10王建龙.生物脱氮新工艺及其技术原理[J].中国给水排水,2000,16(2):25-28. 被引量:119

引证文献1

二级引证文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部