期刊文献+

浮式钻井平台钻具卡点深度计算分析 被引量:2

Analysis and Calculation of Sticking Point Depth in Floating Well Platform
在线阅读 下载PDF
导出
摘要 自升式平台的转盘面相对井眼是固定不变的,而浮式平台受风浪潮涌等影响,相对并筒上下浮动,尤其是在钻具卡钻时超拉或钻具下压相当于平台载荷瞬间改变,平台会上下起伏,这样在超拉计算卡点时测量钻柱伸长量和实际卡点深度相差甚远。为了消除因平台上下浮动的影响,根据物理学原理详细阐述了浮式平台卡点深度超拉计算方法。此方法能较准确的计算出浮式平台卡钻时钻柱卡点,在计算卡点深度上有很好的借鉴意义。 The floating platform is quite different from the jack-up platform, and the turntable of floating platform is not fixed rela- tive to the well bore. Influenced by storm surge and other effects, floating platform floats up and down relative to wellbore, especially when pulling up during drill pipe sticking or during drill press, which is equivalent to a platform load change suddenly. Therefore, the measured drill string elongation and sticking point when conducting super pull calculation are quite different from the actual stick- ing point depth. In order to eliminate the influence of fluctuating up and down for the platform floating, on the basis of the physics principles, super pull calculation method has been discussed in detail to calculate the depth of sticking point for the floating platform. With this method, the sticking point can be calculated exactly the when drill pipe sticking occurs for floating platform, being good for reference when calculating the sticking point depth.
出处 《海洋石油》 CAS 2012年第2期95-97,共3页 Offshore Oil
关键词 浮式平台 可变载荷 潮差 钻柱伸长 钢材弹性模量 floating well platform variable load tidal range drill stem elongation steel elastic modulus
  • 相关文献

参考文献5

二级参考文献19

共引文献67

同被引文献35

  • 1朱园园,刘凯,彭记川.尾管作业中管柱伸缩量公式推导与应用[J].中国石油和化工标准与质量,2020(8):123-124. 被引量:1
  • 2秦永和,付胜利,高德利.大位移井摩阻扭矩力学分析新模型[J].天然气工业,2006,26(11):77-79. 被引量:54
  • 3郭凤,刘合,张劲.卡点计算的有限元分析[J].机械工程学报,2007,43(1):158-163. 被引量:7
  • 4张景良,魏群涛,吴思琼.CQY-Ⅰ型测卡松扣仪研制及应用[J].石油矿场机械,2007,36(10):82-84. 被引量:3
  • 5NEWMAN K R. Coiled-tubing stretch and stuck-point calculations [ C ]//Congress SPE / ICoTA Coiled Tubing Roundtable: Houston TX. 25-26 May 1999:69-78.
  • 6AADNOY B S,LARSEN K,BERG P C. Analysis of stuck pipe in deviated boreholes [ J ]. Journal of Petroleum Science and Engineering, 2003,37 ( 3-4 ) : 195 -212.
  • 7PEID P I, MEETEN G H, WAY P W. Differential-sticking mechanisms and a simple wellsite test for monitoring and optimizing drilling mud properties [ J ]. SPE Drilling & Completion, 2000, 15 (2) :97-104.
  • 8SIEMS G, BOUDREAUX S. Applying radial acoustic amplitude signals to predict intervals of sand-stuck tubing[ J]. SPE Production & Operations ,2007,22 ( 2 ) :254-259.
  • 9GREY, KEVIN L. Method for determining a stuck point for pipe and free point logging tool[ P]. US:7389183. 2008.
  • 10宋德军.管柱卡点计算[J].油气井测试,2008,17(1):15-17. 被引量:6

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部