摘要
通过对综采放顶煤系统的分析,运用模块化程序设计手段,建立起优化仿真模型,从而解决了放顶煤诸工序之间协调运作、优化匹配等技术问题。
Through the analysis for long wall raining with caving, to use the designing methods of modulized program to establish optimized imitailon models, some technical problems were solved such as coodination between the working sequences of caving, etc.
出处
《煤矿现代化》
2000年第2期15-16,共2页
Coal Mine Modernization