平煤四矿副井改造方案的优化设计

Optimization Design of Auxiliary Shaft Improved Sheme in Fourth Coal Mine of Pingdingshan Coal Mine Shares
原文传递
导出
摘要 平煤股份四矿是一个具有多年开采历史的老矿井,其副井系统已不能满足矿井安全生产的需要。结合平煤股份四矿副井系统实际情况,分析了副井系统存在的问题,提出了2个副井罐道更换改造方案。通过对方案的比较及分析,确定了平煤四矿副井改造的最优方案,该方案对相似条件的副井改造方案设计有一定的参考意义。 The fourth coal mine of Pingdingshan Coal Mine Shares is an old mine with years oI mining history, its auxiliary shaft system already cannot satisfy the needs of safety in production. Combinaed with the practical situation of the shares fourth coal mine auxiliary shaft systems Pingdingshan Coal Mime, analyses its problems and proposed two improved schemes. Through the comparison and analysis, the optimal scheme of coal mine improvement is identified, which has a certain reference ,~alue to the similar conditions in the renovation design.
作者 高淑琴
出处 《煤炭技术》 CAS 北大核心 2012年第7期103-104,共2页 Coal Technology
关键词 副井改造 罐道更换 轻型罐笼 方案优化设计 auxiliary shaft improvement tank replacement light cage scheme optimization design
  • 相关文献

参考文献1

  • 1成大宪.机械设计手册[M].5版.北京:化学工业出版,2009.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部