Mitigating Subsynchronous Resonance Torques Using Dynamic Braking Resistor
Mitigating Subsynchronous Resonance Torques Using Dynamic Braking Resistor
摘要
Series compensation has proven to increase stability in transmission of electric power. On the other hand insertion of series capacitor results in severe subsynchronous torques. The subsynchronous torque leads to generator-turbine shaft damage. Mitigation of subsynchronous transient torques is achieved through resistor bank connected to generator terminals. The insertion of resistor bank is controlled by fuzzy logic controller. The proposed controller has been tested on IEEE First Benchmark Model and it proved to have good damping for the torsional torques.
参考文献14
-
1IEEE Subsynchronous Resonance Working Group of the System Dynamic Performance Subcommittee, Terms, definitions and symbols for subsynchronous oscillations, IEEE Transactions on Power Apparatus and Systems PAS-104 (6) (1985) 1326-1333.
-
2E.T. Ooi, M.M. Sartawi, Concepts on field excitation control of subsynchronous resonance in synchronous machines, IEEE Transaction on Power Apparatus andSystems PAS-97 (5) (1978) 1637-1645.
-
3M.K. Donnelly, J.R. Smith, R.M. Johnson, J.F. Hauer, R.W. Brush, R. Adapa, Control of a dynamic brake to reduce turbine-generator shaft transient torques, IEEE Transactions on Power Systems 8 (1) (1993) 67-73.
-
4O. Wasynczuk, Damping shaft torsional oscillations using a dynamically controlled resistor bank, IEEE Transactions on Power Apparatus and Systems PAS-100 (7) (1981) 3340-3349.
-
5A.H.M.A. Rahim, A minimum-time based fuzzy logic dynamic braking resistor control for sub-synchronous resonance, Electrical Power and Energy Systems 26 (2004) 191-198.
-
6IEEE Subsynchronous Resonance Working Group of the System Dynamic Performance Subcommittee, First Benchmark Model for computer simulation of subsynchronous resonance, IEEE Transactions on Power Apparatus and Systems PAS-96 (5) (1977) 1566-1572.
-
7M.L. Shelton, P.F. Winkelman, W.A. Mittelstadt, W.J. Bellerby, Bonneville power administration 1400-MW braking resistor, IEEE Transaction on Power Apparatus and Systems PAS-94 (2) (1975) 602-611.
-
8State of the art in non classical means to improve power system stability, Electra, May 1988, pp. 88-113.
-
9S. Helmy, A.S. Waked, M.A. Rahman, M.A. Badr, Real-time modeling of synchronous generators based on PC, in: 13th International Middle East Power System Conference MEPCON '09, Assuit, Egypt, 2009, pp. 337-343.
-
10I.M. Canay, Determination of model parameters of synchronous machines, lEE Proceeding Part B: Electric Power Applications 130 (2) (1983) 86-94.
-
1唐道济.音响设备中的电阻器[J].高保真音响,2005(10):46-47.
-
2温志明,康向东.测定扭矩的电测法[J].实用测试技术,2001,27(6):20-21. 被引量:4
-
3于云霞,李娟.基于特征值分析法的电力系统次同步振荡研究[J].电气技术,2017,18(4):44-48. 被引量:8
-
4刘璇,宋强,刘文华.海上风电场并网柔直系统的故障穿越协调控制策略[J].电测与仪表,2016,53(19):1-6. 被引量:9
-
5叶声雯.变电设备发热缺陷的预防与处理[J].贵州电力技术,2009,12(11):23-24.
-
6田向东.数字音频广播(DAB)单频发射网基准模型[J].西部广播电视,2005,26(10):10-12.
-
7李东东,叶辰升.基于改进风力发电机组下的低电压穿越控制策略研究[J].电力系统保护与控制,2013,41(20):34-40. 被引量:12
-
8齐尚敏,李凤婷,何世恩,刘光途,黄蓉.具有低电压穿越能力的集群接入风电场故障特性仿真研究[J].电力系统保护与控制,2015,43(14):55-62. 被引量:33
-
9李琦,宋强,刘文华,饶宏,许树楷,黎小林.基于柔性直流输电的风电场并网故障穿越协调控制策略[J].电网技术,2014,38(7):1739-1745. 被引量:76
-
10赵鹏,杨帆,李晨曦.SFCL对HVDC系统中换相失败的影响[J].黑龙江电力,2014,36(5):423-426. 被引量:1