摘要 大坝外部变形安全监测的诸多项目,大多是近十数年来才开始在水电工程上逐渐被采用的,虽然作为水平位移监测项目之一的倒垂线法由来已久,但其施工的难度是水电行为共认的。本文即是从这方面入手,结合黄河大峡水电站工程的施工实践,总结了一些施工经验,以供交流参考。 Most items of dam external deformation monitoring are progressively adopted in hydropower projects during the last ten years. Although the monitoring of horizontal displacement is measured by reversed pendulum method for a long time, its difficulty is evident. Therefore, initiating from the method, in conjunction with implementation of Daxia Hydropower Station on the Yellow River, the experience is summarized, which may provide some reference for other projects.
作者 张平
出处 《陕西水力发电》 2000年第1期49-52,共4页 Journal of Shaanxi Water Power
关键词 变形监测 水平位移 大坝 倒垂线 正垂线 引张线 deformation monitoring horizontal displacement reversed pendulum perpendicular line tension rupture line
  • 相关文献

同被引文献3

  • 1DL/T5178-2003.混凝土坝安全监测技术规范[S].北京:中国水利水电出版社,2003:63-65.
  • 2二滩水电开发有限公司.岩土工程安全监测手册[M].北京:中国水利水电出版社,1999..
  • 3祝德生,张辉.江垭大坝倒垂孔施工技术[J].探矿技术,1998(1):6-8. 被引量:1

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部