摘要 三峡工程主体建筑物有大坝、电站和通航建筑物。大坝的泄洪与消能、厂房1~5号坝段深层抗滑稳定、大坝混凝土设计、电站进水口型式及引水压力管道、蜗壳结构型式及抗振、永久船闸高边坡、永久船闸输水系统及金属结构、升船机承重结构及提升平衡系统等设计中主要技术问题,由设计单位和国内一些高等院校、科研单位多年研究,已基本解决,经主管部门审定后,正陆续实施。 : The main structures of the Three Gorges: Project includes dam, power plant and navigation structure. Major technical issues including discharge and energy dissipation of the dam, stabilization against sliding in 1~5th section of powerhouse, dam concrete design, type of power plant water intake and water diversion penstock, permanent shiplock conduit system and metal structure as well as shiplifter bearing construction and lifting-raising balance system,etc. have been basically solved by design unit and domestic u-niversities and scientific institutes with many year's research. They are being implemented with the review and audit by related authorities.
作者 郑守仁 刘宁
出处 《中国水利》 2000年第5期21-23,共3页 China Water Resources
关键词 泄洪坝 电站厂房 引水管道 升船机 三峡水利枢纽 dam discharging flood powerhouse diversion penstock permanent shiplock shiplifter the Three Gorges' Project
  • 相关文献

参考文献1

二级参考文献3

共引文献32

同被引文献17

引证文献1

二级引证文献40

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部