基坑降水方案确定的VB可视化系统设计

The Visual Program Design by VB for Establishing the Foundation Dewatering Scheme
原文传递
导出
摘要 针对基坑降水方案确定过程中的计算问题,参考相关技术手册及资料,总结了其主要计算步骤。基于VB程序设计方法,编写可视化程序,实现不同井位、抽水量、井结构条件下,基坑范围内水位变化预报。结合北京某大厦基坑调查的实际数据,对基坑工程的降水方案进行了设计计算,获得了井点数量及间距、布井方式等对施工有指导意义的数据,同时,对人工降水对周围水环境的影响进行了预测。结果表明:通过人机交互系统,可方便快速地确定合理的降水实施方案,为安全施工提供可靠依据。 Aiming at the calculation of establishing the scheme for foundation dewatering, the key steps have been summarized by the authors, basing on the related technical manual and reference. The visual program has been written with Visual Basic language. Making use of it, the changes of the water level in the foundation area can be predicted timely, in the condition of the different well locations, well construction, pumping rate and others. Based on the building pit survey data in Beijng, a dewatering scheme of foundation pit was designed, the amount and spacing of well were obtained, and Flow field of surrounding foundation pit was forecasted. The result shows that the dewatering scheme will be made quickly and reasonable by human-computer interaction, which will provide a reliable basis for the safe construction.
出处 《地下空间与工程学报》 CSCD 北大核心 2012年第3期583-589,共7页 Chinese Journal of Underground Space and Engineering
基金 国家自然科学基金(41002077)
关键词 基坑降水 可视化程序 VB语言 降水方案 foundation dewatering visual program Visual Basic language dewatering scheme
  • 相关文献

参考文献13

二级参考文献27

共引文献134

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部