水布垭水电站施工现代管理技术 被引量:1

Modern Management Techniques of Shuibuya Hydroelectric Plant
在线阅读 下载PDF
导出
摘要 在市场经济条件下,如何以工程项目为对象,实现动态管理和资源的优化配置,做好施工项目的事前、事中、事后管理,提出一些方法和措施。针对水布垭工程实际情况,结合葛洲坝集团近20年项目管理的实践和现代化管理技术的成果,对水布垭混凝土面板堆石坝的施工管理模式、进度控制、质量控制等进行分析,提出适应特大型水电站施工现代化管理的初步成果。 The conditions of market economy, how to project an object, to achieve dynamic management and optimal allocation of resources, good construction project prior to matter, after the management, in this paper, a number of methods and measures. Shuibuya concrete face rockfill dam construction management model for the the Shuibuya actual situation, combined with the results of the Gezhouba Group for nearly 20 years of project management practices and modern management techniques, schedule control, quality control, research, and proposed to adapt modern management of very large hydropower station construction preliminary results.
出处 《交通科技与经济》 2012年第4期60-63,共4页 Technology & Economy in Areas of Communications
关键词 水布垭水电站 管理模式 质量 进度 控制 Shuibuya hydroelectric plant management model quality schedule control
  • 相关文献

参考文献3

  • 1长江水利委员会.水布垭混凝土面板堆石坝初步设计[R].武汉:长江水利委员会,1998.
  • 2中华人民共和国电力行业标准.混凝土面板堆石坝施工规范(DL/T5128--2001)[S].北京:科学出版社,2001.
  • 3中国葛洲坝集团.混凝土面板堆石坝施工工法(G·B/0001-1999)[S].

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部