期刊文献+

CAD与EXCEL的深层开发在高桩码头沉桩中的应用 被引量:1

In-depth Development of CAD and EXCEL and Their Application in Pile Driving for Piled Wharf
在线阅读 下载PDF
导出
摘要 主要介绍了CAD、EXCEL软件VB二次开发的打桩一键通软件,该软件在高桩码头桩基工程中可"全自动"、"全智能"绘制桩位图、碰桩图,并且根据碰桩条件自动检查碰桩情况。大量减少了技术人员的复核验算工作,通过一个按键使打桩技术中的计算、绘图变得简单、方便。 This paper mainly introduces an "e-touch" pile driving software based on the in-depth development of CAD and EXCEL by using the Visual Basic (VB) program, which is used for automatically and intellectually drawing diagrams for pile locations and pile collision in pile driving for piled wharfs, and checking automatically the state of pile collision according to the programmed pile collision conditions. It greatly reduces people's work volume in re-checking and checking calculations and makes it easier and more convenient for calculating and drawing for pile driving by using one button.
作者 李辉 杜建钢
出处 《中国港湾建设》 2012年第3期22-24,共3页 China Harbour Engineering
关键词 CAD EXCEL VB 深层开发 碰桩验算 CAD EXCEL VB in-depth development pile collision calculation
  • 相关文献

参考文献4

共引文献100

同被引文献6

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部