摘要
本文研究了公路建设中土石方调运的实际背景,提出了处理该问题的数
On the basis of realistic background for the Cubic metre of earthe and stone allocation and transport in highway constrction,this paper proposes a relative mathematical model and a series of socution methods.
出处
《系统工程》
CSCD
2000年第2期49-51,共3页
Systems Engineering