摘要
首钢京唐公司2号高炉采用2罐矿1罐焦为1个批次的装料模式进行大矿批试验,通过一段时间的摸索,炉况逐步稳定,负荷水平进一步提升。目前,负荷达5.44,大矿批应用比较成功。
In the large ore batch test of Shougang Jingtang No. 2 blast furnace, the loading mode is two bins ore and one bin coke. According to some tests, the blast furnace statation is gradually stable, and the load level enhances. The present load is 5.44. the ore batch test is successful.
出处
《首钢科技》
2012年第2期35-38,共4页
Shougang Science and Technology
关键词
特大型高炉
大矿批
负荷提高
large blast furnace, large ore batch, load increase